OMS PTRI—ONE MONTH TRAINING MODULE

Sl.No. FIRST PERIOD SECOND PERIOD THIRD PERIOD
1

Inauguration

Introduction Raw materials
2 Plant layout Major equipments Thermal cycle
3 Blr + Aux Blr+Aux Blr+Aux
4 Blr + Aux Blr+Aux Blr+Aux
5 Blr + Aux Blr+Aux Blr+Aux
6 Blr + Aux Blr+Aux Blr+Aux
7 OFF OFF OFF
8 Turb+Aux Turb+Aux Turb+Aux
9 Turb+Aux Turb+Aux Turb+Aux
10 Turb+Aux Turb+Aux Turb+Aux
11 Generator+Aux Generator+Aux Generator+Aux
12 Generator+Aux Generator+Aux Generator+Aux
13 Blr+Aux Blr+Aux Blr+Aux
14 OFF OFF OFF
15 Turb+Aux Turb+Aux Turb+Aux
16 Startup & shut down of Boiler Startup & shut down of Boiler Startup & shut down of Boiler
17 Startup & shut down of Turbine Startup & shut down of Turbine Startup & shut down of Turbine
18 Coal handling Coal handling Coal handling
19 Ash handling Ash handling Cooling Tower
20 Water treatment Water treatment Water treatment
21 OFF OFF OFF
22 PLANT VISIT PLANT VISIT PLANT VISIT
23 Elect-distribution Elect-distribution Elect-distribution
24 Elect-motors Elect-motors Elect-motors
25 Instrumentation Instrumentation Instrumentation
26 Instrumentation Instrumentation Instrumentation
27 Safety Safety Safety
28 OFF OFF OFF
29 Maintenance Maintenance Maintenance
30 VALEDICTORY VALEDICTORY VALEDICTORY
  • Hurry up - degree/diploma engineers for registration and admission to 24th batch of 30 weeks training on O&M of Thermal Power Plants to start from mid November 2017.
  • Date of Entrance test - 30.10.2017.
  • 23rd Batch class commencement from 23rd March 2017
  • 22nd batch of 30 weeks Training Program(Theory/Simulator/On-Job) on O&M Thermal Power Plant including Solar Power. Classes started from 27th March 2017.
  • Recently 8 Engineers placed in O&M Solutions Private Limited, Bhubaneswar.
  • Recently 8 Engineers placed in JAY BALAJI INDUSTRIES LIMITED, Durgapur.
  • Specialised Training on "STEAM TURBINE GOVERNING" was held on 27th & 28th of January 2017, where many experienced engineers from different corporate houses attended the program
  • Onsite Training to Engineers of TATAPOWER BINA (25th & 26th August 2016) on Boiler & Turbine.
  • Training to Engineers at DB Power, Raigarh on Boiler Tube Failure, Emergencies and Turbine Governing System from 12th September 2016 to 15th September 2016
  • Training to Engineers from Gas Authority India Ltd. from 1st August 2016 to 6th August 2016
  • 21st batch of 30 weeks Training on O&M of Thermal Power Plant compleated.
  • 90Days Training on Skill Development program of SURYAMITRA 1St Batch Compleated.
  • Completed 1 batches of training at Tata Sponge.
  • Completed 5 batches of training at Tata Power.
  • Short Term Training given to working professionals from corporate houses like GAIL,TATA SPONGE, TATA POWER, NALCO, HINDALCO, ADITYABIRLA, OPGC, GMR, LANCO, MONNET POWER, NAVBHARAT, IFFCO, KPSE, BRPL, SOGEX OMAN, AVANTA POWER & SEMBCORP(United Arab Emirates)



  • OMS Power Training And Research Institute has been recognized by theCentral Electricity Authority (CEA), Ministry of Power, Govt. of India.for providing this training on O&M of elcetrical plants, transmission & Distribution systems irrespective of the capacity of the power plant/ voltage level of transmission & Distribution systems.

    • Thermal Power Plant Training
    • IGCC (International General Certification Course) provided by NEBOSH UK
    • Thermal Power Plant Refresher Course
    • Advanced PC based Simulator Training course of 2 Weeks duration available.
    • Refresher Course on Indian Power Sector & Regulatory Affairs
    • Refresher Course on Power Plant Chemistry
    • Vocational Training
    • Need based Power Plant Training

    Books Download