• Admission open for Degree/diploma engineers to 24th batch of 30 weeks duration training on O&M of Thermal Power Plant & Solar Power to start by mid December 2017.
  • Admission open to Degree/diploma engineering students for 1 MONTH duration condensed training course on O&M of Thermal Power Plant.
  • 23rd Batch class commenced from 17th July 2017.
  • Recently 8 Engineers placed in O&M Solutions Private Limited, Bhubaneswar.

    • Recently 8 Engineers placed in JAY BALAJI INDUSTRIES LIMITED, Durgapur.

      • Specialised training on "ADVANCED GAS TURBINE & CCPP" was held from 4th September to 8th September 2017 for engineers from MECON Ltd.

        • Specialised training on "STEAM TURBINE GOVERNING" was held on 27th & 28th of January, Where many experienced engineers from different corporate houses attended the program

          • Training to Engineers at DB Power, Raigarh on Boiler Tube Failure, Emergencies and Turbine Governing System from 12th September 2016 to 15th September 2016

            • Onsite Training to Engineers of TATAPOWER NELLORE (27th September 2017) on O&M of Boilers & Auxiliaries and Coal conveying System.

              • Onsite Training to Engineers of TATAPOWER BINA (25th & 26th August 2016) on Boiler & Turbine.

                • Training to Engineers from Gas Authority India Ltd. from 1st August 2016 to 6th August 2016

                  • 22nd batch of 30 weeks Training on O&M of Thermal Power Plant compleated.

                    • 90Days Training on Skill Development program of SURYAMITRA 1St Batch Compleated.

                      • Recognised by National Institute of Solar Energy (NISE)

                        • Partnership with National Institute of Solar Energy (NISE) for Solar Engineering Training Network (SETNET)
                          • CEA RECOGNISED 30 WEEKS TRAINING ON OPERATION AND MAINTENANCE OF THERMAL POWER PLANT
                            • 30 WEEKS TRAINING PROGRAMS
                                • 22 batches of 30 Weeks long Training on O & M of Thermal Power Plant completed.
                                  • 07 batches of 24 weeks training on Combined Cycle Power Plant completed so far.
                                  • Placement-----90% trainees of 30 weeks training placed in different companies. OMSPTRI is patronized by O&M Solutions Pvt., which hires professionals to do the operation & maintenance at thermal power plants inside and outside Odisha. Also we have presence in some international projects in countries like Bangladesh, Libya , Indonesia, Middle East Countries etc. For this there is a huge need of trained manpower both experienced and freshers. Also more than 20 other Indian companies
                                    • VOCATIONAL TRAINING PROGRAMS
                                        • Vocational Training to 8 batches compleated along with OPTCL in their training institute at Bhubaneswar.
                                        • • 08 batches of 1 month duration vocational training to engineering students on O & M of Thermal Power Plant completed so far.
                                          • SIMULATOR TRAINING PROGRAMS
                                              Admission open for Advanced PC based Simulator Training course of 2 Weeks duration for the following.
                                                • Super Critical Simulator (700 MW)
                                                • Sub Critical Simulator (370 MW)
                                                • Combined Cycle Power Plant Simulator(730 MW)
                                              • Simulator Training imparted to Experienced Engineers of
                                                  • G M R
                                                  • AES OPGC
                                                  • HINDALCO
                                                  • ADITYABIRLA
                                                  • SEMBCORP(United Arab Emirates)
                                                • TRAINING TO ITI TECHNICIANS/ OPERATORS
                                                    • 01 batch of Training imparted to engineers & ITIs for one month on Boiler operation.
                                                    • 02 batch of one month Training imparted to operators and technicians of Korba West Power Co. Ltd at Raigarh.
                                                    • 01 batch of one month Training imparted to operators and technicians Lancopower,Angul
                                                  • CORPORATE TRAINING PROGRAMS
                                                      • 01 batches of training imparted to Engineers at Tata Sponge
                                                      • 05 batches of training imparted to Engineers at Tata Power
                                                      • 02 batches of Training imparted to Engineers at Korba West Power Co. Ltd., Raigarh.
                                                      • 01 batch of one week training on BOILER TUBE FAILURE to K P S E engineers completed.
                                                      • 01 batch of one week training on INSTRUMENTATION SYSTEM to KPSE engrs completed.
                                                      • 02 batch of training to engineers from Nalco on Performance & Efficiency, Best Practices on Power Plant
                                                    • ON SITE TRAINING PROGRAMS held at following places to engineers and operators
                                                        • Monnet power company, Angul
                                                        • Navbharat ventures ltd,Angul
                                                        • Ib thermal power station,jharsuguda
                                                        • Korba West Power Co. Ltd., Raigarh.
                                                        • Lanco, Angul
                                                        • IFFCO
                                                      • SAFETY TRAINING PROGRAMS
                                                          • Admission open for 2 Weeks NEBOSH International General Certificate Course (IGCC) Training
                                                          • 01 batch of two weeks Training on NEBOSH, UK certified International General Certificate Course on Occupational Safety and Health completed so far.
                                                        • Training on safety held for following:-
                                                            • EDAC, Chennai
                                                            • JINDAL STAINLESS LTD
                                                            • GMR
                                                            • EMAMI PAPER
                                                            • J I T P L
                                                            • Korba West Power Co. Ltd., Raigarh.
                                                            • B R P L
                                                          • WORKSHOP/ SEMINARS
                                                            • One Day National Level workshop in collaboration with Odisha State Pollution Control Board on “Industrial Water Treatment, challenges and Opportunities” held on 23 November 2013 at Bhubaneswar
                                                              • Two Days National Seminar on "NEED FOR NEXT STAGE POWER SECTOR REFORMS, ADOPTION OF CLEAN & SMART GRID TECHNOLOGY AND BEST PRACTICES OF THERMAL POWER PLANT PERFORMANCE" in collaboration with The WORLD BANK & OERC on held on 19th & 20th January 2015 at Bhubaneswar
                                                                • Two days training held at Cuttack to utility engineers on DSM & Energy conservation.



  • Admission open for Degree/diploma engineers to 24th batch of 30 weeks duration training on O&M of Thermal Power Plant & Solar Power to start by Mid December 2017.
  • Admission open to Degree/diploma engineering students for 1 MONTH duration condensed training course on O&M of Thermal Power Plant.
  • 23rd Batch class commenced from 17th July 2017.
  • Specialised training on "ADVANCED GAS TURBINE & CCPP" was held from 4th September to 8th September 2017 for engineers from MECON Ltd.
  • Recently 8 Engineers placed in O&M Solutions Private Limited, Bhubaneswar.
  • Recently 8 Engineers placed in JAY BALAJI INDUSTRIES LIMITED, Durgapur.
  • Specialised Training on "STEAM TURBINE GOVERNING" was held on 27th & 28th of January 2017, where many experienced engineers from different corporate houses attended the program
  • Onsite Training to Engineers of TATAPOWER NELLORE (27th September 2017) on O&M of Boilers & Auxiliaries and Coal conveying System.
  • Onsite Training to Engineers of TATAPOWER BINA (25th & 26th August 2016) on Boiler & Turbine.
  • Training to Engineers at DB Power, Raigarh on Boiler Tube Failure, Emergencies and Turbine Governing System from 12th September 2016 to 15th September 2016
  • Training to Engineers from Gas Authority India Ltd. from 1st August 2016 to 6th August 2016
  • 22nd batch of 30 weeks Training on O&M of Thermal Power Plant compleated.
  • 90 Days Training on Skill Development program of SURYAMITRA 1St Batch Compleated.
  • Completed 1 batch of training at Tata Sponge.
  • Completed 5 batches of training at Tata Power.
  • Short Term Training given to working professionals from corporate houses like GAIL,TATA SPONGE, TATA POWER, NALCO, HINDALCO, ADITYABIRLA, OPGC, GMR, LANCO, MONNET POWER, NAVBHARAT, IFFCO, KPSE, BRPL, SOGEX OMAN, AVANTA POWER & SEMBCORP(United Arab Emirates).MECON



  • OMS Power Training And Research Institute has been recognized by theCentral Electricity Authority (CEA), Ministry of Power, Govt. of India.for providing the training on O&M of elcetrical plants, transmission & Distribution systems irrespective of the capacity of the power plant/ voltage level of transmission & Distribution systems.

    • Thermal Power Plant Training
    • Thermal Power Plant Refresher Course
    • Advanced PC based Simulator Training course of 2 Weeks duration available.
    • Refresher Course on Indian Power Sector & Regulatory Affairs
    • Refresher Course on Power Plant Chemistry
    • Vocational Training
    • Need based Power Plant Training

    Books Download