• 30 weeks For Trainee Engineers(Degree and Diploma):
    OMS Power Training And Research Institute has understanding with some nearby Power Plants for deputing their trainees (OMSPTI-01) for in plant training lasting a period of Twelve weeks.
  • For In-Service Trainees:
    This program is designed to assist existing industries with in-service training of their employees, to provide entry-level skills for new employees, and to provide upgrading or refresher training for current employees. In most cases this training can be done at the assigned work stations during normal working hours without hindering production. The instructors are provided by OMS Power Training And Research Institute or may be employees of the company, if special conditions are met.
  • Vocational Trainees:
    One day visit to a power plant is arranged by OMSPTRI to a reputed nearby power plant / electrical Transmission & Distribution system.

  • Admission open for Degree/diploma engineers to 24th batch of 30 weeks duration training on O&M of Thermal Power Plant & Solar Power to start by Mid December 2017.
  • Admission open to Degree/diploma engineering students for 1 MONTH duration condensed training course on O&M of Thermal Power Plant.
  • 23rd Batch class commenced from 17th July 2017.
  • Specialised training on "ADVANCED GAS TURBINE & CCPP" was held from 4th September to 8th September 2017 for engineers from MECON Ltd.
  • Recently 8 Engineers placed in O&M Solutions Private Limited, Bhubaneswar.
  • Recently 8 Engineers placed in JAY BALAJI INDUSTRIES LIMITED, Durgapur.
  • Specialised Training on "STEAM TURBINE GOVERNING" was held on 27th & 28th of January 2017, where many experienced engineers from different corporate houses attended the program
  • Onsite Training to Engineers of TATAPOWER NELLORE (27th September 2017) on O&M of Boilers & Auxiliaries and Coal conveying System.
  • Onsite Training to Engineers of TATAPOWER BINA (25th & 26th August 2016) on Boiler & Turbine.
  • Training to Engineers at DB Power, Raigarh on Boiler Tube Failure, Emergencies and Turbine Governing System from 12th September 2016 to 15th September 2016
  • Training to Engineers from Gas Authority India Ltd. from 1st August 2016 to 6th August 2016
  • 22nd batch of 30 weeks Training on O&M of Thermal Power Plant compleated.
  • 90 Days Training on Skill Development program of SURYAMITRA 1St Batch Compleated.
  • Completed 1 batch of training at Tata Sponge.
  • Completed 5 batches of training at Tata Power.
  • Short Term Training given to working professionals from corporate houses like GAIL,TATA SPONGE, TATA POWER, NALCO, HINDALCO, ADITYABIRLA, OPGC, GMR, LANCO, MONNET POWER, NAVBHARAT, IFFCO, KPSE, BRPL, SOGEX OMAN, AVANTA POWER & SEMBCORP(United Arab Emirates).MECON



  • OMS Power Training And Research Institute has been recognized by theCentral Electricity Authority (CEA), Ministry of Power, Govt. of India.for providing the training on O&M of elcetrical plants, transmission & Distribution systems irrespective of the capacity of the power plant/ voltage level of transmission & Distribution systems.

    • Thermal Power Plant Training
    • Thermal Power Plant Refresher Course
    • Advanced PC based Simulator Training course of 2 Weeks duration available.
    • Refresher Course on Indian Power Sector & Regulatory Affairs
    • Refresher Course on Power Plant Chemistry
    • Vocational Training
    • Need based Power Plant Training

    Books Download