Available for Combined Cycle(730 MW) Gas Based Plant(9FA), Sub-critical(370 MW)- drum mill, both bfp & turbine driven pumps, Forced Circulation, Bag Filter , Steam Bypass System, Supercritical(700MW)- Bowl Mill, ESP, Electrical Protections etc All generic features of power plant are incorporated in a state of the art, PC based and Hi-fidelity system based on real plant operation.

Course Duration: 2 weeks, Batch Strength: 22, Structure: Plant Graphics Studies, Start-up, Shut-down, Emergencies & Malfunctions like tube failure, vacuume falling, grid frequency disturbance, run-back & run-down actions etc.

In addition the simulator can be used as a powerful tool for engineers and plant management to verify process design and control strategies prior to start-up of a plant as well as investigation and testing of operational problems that are normally not allowable under real plant normal operating Simulator is highly flexible and can be used in a number of different ways to suit the changing needs of the thermal power plant.
OMS power training institute provides state of the art training facility to the trainees.

  • Hurry up - degree/diploma engineers for registration and admission to 24th batch of 30 weeks training on O&M of Thermal Power Plants to start from mid November 2017.
  • Date of Entrance test - 30.10.2017.
  • 23rd Batch class commenced from 17th July 2017.
  • 22nd batch of 30 weeks Training Program(Theory/Simulator/On-Job) on O&M Thermal Power Plant including Solar Power. Classes started from 27th March 2017.
  • Recently 8 Engineers placed in O&M Solutions Private Limited, Bhubaneswar.
  • Recently 8 Engineers placed in JAY BALAJI INDUSTRIES LIMITED, Durgapur.
  • Specialised Training on "STEAM TURBINE GOVERNING" was held on 27th & 28th of January 2017, where many experienced engineers from different corporate houses attended the program
  • Onsite Training to Engineers of TATAPOWER BINA (25th & 26th August 2016) on Boiler & Turbine.
  • Training to Engineers at DB Power, Raigarh on Boiler Tube Failure, Emergencies and Turbine Governing System from 12th September 2016 to 15th September 2016
  • Training to Engineers from Gas Authority India Ltd. from 1st August 2016 to 6th August 2016
  • 21st batch of 30 weeks Training on O&M of Thermal Power Plant compleated.
  • 90Days Training on Skill Development program of SURYAMITRA 1St Batch Compleated.
  • Completed 1 batches of training at Tata Sponge.
  • Completed 5 batches of training at Tata Power.
  • Short Term Training given to working professionals from corporate houses like GAIL,TATA SPONGE, TATA POWER, NALCO, HINDALCO, ADITYABIRLA, OPGC, GMR, LANCO, MONNET POWER, NAVBHARAT, IFFCO, KPSE, BRPL, SOGEX OMAN, AVANTA POWER & SEMBCORP(United Arab Emirates)



  • OMS Power Training And Research Institute has been recognized by theCentral Electricity Authority (CEA), Ministry of Power, Govt. of India.for providing this training on O&M of elcetrical plants, transmission & Distribution systems irrespective of the capacity of the power plant/ voltage level of transmission & Distribution systems.

    • Thermal Power Plant Training
    • IGCC (International General Certification Course) provided by NEBOSH UK
    • Thermal Power Plant Refresher Course
    • Advanced PC based Simulator Training course of 2 Weeks duration available.
    • Refresher Course on Indian Power Sector & Regulatory Affairs
    • Refresher Course on Power Plant Chemistry
    • Vocational Training
    • Need based Power Plant Training

    Books Download